Typical starting points

The hybrid environment works, but nobody remembers exactly why. An audit demands a hardened mail infrastructure. The certificate on the hybrid connector is about to expire and the documentation is missing. Or a new gateway has to be inserted into a grown mail flow without anything getting stuck. In these situations I start by establishing the actual state before anything is changed: connectors, transport rules, accepted domains, submitting systems.

Services

  • Architecture reviewInventory of mail routing, connectors, transport rules and submitting systems, with prioritised measures instead of finding lists.
  • Hybrid operations and hardeningHybrid connectors, certificate rollovers, internal/external classification, locking down the on-premises edge when MX points to the cloud.
  • Rebuilding mail routingInserting or replacing gateways, routing changes with a rollback plan, rounding up direct-send sources.
  • Operations automationPowerShell evaluations for message tracking, connector inventory and recurring operational tasks.

How an engagement runs

  1. Intro call and goal definitionNo obligation, directly with me. We clarify the starting point, goal and scope; you then receive a concrete offer with transparent terms.
  2. Analysis on the real systemEvaluating the actual configuration and the actual mail flow, not the assumed architecture.
  3. Implementation with a way backChanges in small, verifiable steps, planned to be reversible at any point.
  4. Documentation and handoverYour operations team can maintain the result without me.

Real-world examples